Bellingham, WA (GV25-0169) -
Aug. 10 - Aug. 24, 2025
BUILD DETAILS | |
---|---|
Work schedule: |
9am-4pm Tuesday-Saturday
|
Type of work: |
Building Townhomes
|
Parking location: |
On-Site
|
Parking fee per night: |
$0.00
|
Hookups: |
Electric: 30 amp, Water: At rig, Sewer: < 100 ft.
|
Max rig size: | |
Miles to job site: |
< 5 miles
|
Spaces available: | 6 of 6 |
Team leader: |
Return to the list of builds